MARIPOSA COUNTY, Calif. (KSEE/KGPE) - Delays are expected successful immoderate Mariposa County areas owed to operation enactment acceptable to statesman connected July 28, according to Caltrans connected Friday, including 1 of the highways starring to Yosemite National Park.
Caltrans officials accidental they volition behaviour a one-way postulation power opening July 28 connected Highway 140 for attraction and operation operations.
Work connected Highway 140 is scheduled arsenic follows:
- One-way postulation power from the opening connected the passing lane successful Catheys Valley to Highway 49 for pavement enactment from July 28 until July 29, from 8 p.m. to 7 a.m. - and July 30 until Aug. 2 from 7 p.m. to 7 a.m.
- One-way postulation power from Withlock Road to Briceburg for pavement enactment opening July 28 until Aug. 2 from 9 p.m. to 7 a.m.
- One-way postulation power from Briceburg to South Fork Merced River for pavement enactment opening July 28 until Aug. 2 from 9 p.m. to 7 a.m.
- One-way postulation power from South Fork Merced River to Yosemite National Park for pavement enactment opening July 28 until Aug. 2 from 9 p.m. to 7 a.m.
- One-way postulation power from Hummingbird Lane to Mount Bullion Cutoff for inferior enactment connected Aug. 1 from 7 a.m. to 4 p.m.
Drivers are warned to expect 5 to 10-minute delays and usage alternate routes whenever possible, according to Caltrans. Work is scheduled to instrumentality spot arsenic listed, but Caltrans adds that it is taxable to change.