MERCED COUNTY, Calif. (KSEE/KGPE) – Bridge attraction connected Hwy 99 is expected to dilatory down postulation successful Merced County starting Sunday.
According to CalTrans, the week-long over-crossing attraction volition past until Aug. 2. Repair crews accidental they volition beryllium conducting operation overnight to alleviate postulation stress.
The pursuing over-crossings volition beryllium affected arsenic follows:
- One-way postulation power connected the Le Grand Road Over-Crossing from 8 p.m. to 4 a.m.
- One-way postulation power connected the Childs Avenue Over-Crossing from 9 p.m. to 5 a.m.
- One-way postulation power connected the Franklin Road Over-Crossing starting astatine 8 p.m.
- Full off-ramp closure connected northbound and southbound lanes of Highway 99 astatine Le Grand Road Over-Crossing from 8 p.m. to 5 a.m.
In summation to over-crossing maintenance, crews volition beryllium conducting ace and seal operations. The pursuing areas volition beryllium affected arsenic follows:
- Full off-ramp closure connected southbound Highway 99 astatine Plainsburg Road betwixt July 29 and July 30 from 8 a.m. to 3 p.m.
- Full on-ramp closure connected northbound Highway 99 astatine Plainsburg Road connected July 31 from 8 a.m. to 3 p.m.
- Full on- and off-ramp closures connected northbound Highway 99 astatine Westside Boulevard connected Aug. 1 from 8 a.m. to 3 p.m.