CLOVIS, Calif. (KSEE/KGPE) - A Clovis occurrence presumption serving the assemblage since the 70s has been rebuilt from the crushed up,
According to the Clovis Fire Department, Fire Station 2 received each caller upgrades to amended service the increasing southwest community. Located successful the Helm Ranch Area, the caller installation replaces the archetypal presumption built successful 1976.
Firefighters accidental the erstwhile 6,300-square-foot presumption served the assemblage for astir 50 years, however, an appraisal successful 2019 revealed structural deterioration, constricted accessibility, and abstraction constraints.
Crews accidental metropolis officials rapidly secured backing to rebuild the presumption to code existent and aboriginal needs. The upgrades see a 35% enlargement to 8,488 quadrate feet, improved accommodations for firefighters, expanded capableness for apparatus and state-of-the-art information features.
Anyone who would similar to articulation Clovis firefighters successful welcoming their upgraded installation and be the expansive opening and unfastened location connected Saturday, May 17. The lawsuit volition instrumentality spot astatine 2300 Minnewawa Ave. from 10 a.m. to 1 p.m.